Commercial Pipework

Commercial Pipework Package
ICPN1 & TPCP1
This package includes assessment for Installation first fix of pipework in excess of 28mm for natural gas and LPG and testing up to 75mbar and Tightness Testing and direct purging of installation pipework exceeding 1mĀ³ in volume, upto 16 bar operating pressure (nat gas) & 2 bar pressure for LPG.
2 day course.
The Pipework Package can be combined with either the Heating Package or the Catering package as paperwork does overlap so it could then be completed in 4-5 days. The Heating Package and Catering Package are run separately and cannot be combined.
Dates :

10th DecemberĀ – Redruth

7th January – Newton Abbot

Next available dates are to be advised, please contact us for further information.